Playground Committee Meetings

The Playground Committee has now been subsumed into the General Purposes Committee

Upcoming line closure between Guildford and Gatwick Airport from Saturday 1 to Sunday 16 February 2025

Line closure between Guildford and Gatwick Airport from Saturday 1 to Sunday 16 February 2025
Buses will be replacing trains between Guildford to Gatwick Airport, to allow our engineers to complete a number of critical upgrades on the North Downs Line.
What you need to know:
Rail replacement buses will be running from Saturday 1 to Sunday 16 February between:
• Guildford and Redhill stopping at all stations
• Guildford and Gatwick Airport running direct
Southern and Thameslink trains to and from London, Reigate, Redhill and Gatwick Airport are not affected by these works and will continue to operate.
Engineers will be laying new wheel timbers – the blocks that carry tracks over bridges – on the railway bridge over the River Wey, to the south of Guildford. Teams will also be stabilising one of the cuttings that borders the railway in Gomshall to reduce the risk of landslips that lead to lengthy line closures, as well as modernising the signalling in the area, including the renewal of four level crossings (Brook, Burrows, Chilworth and Tangley).
They have set up a dedicated webpage at https://www.networkrail.co.uk/NorthDownsLine which will be regularly updated as the work progresses.

Instructions

The archives are in reverse chronological order, so to find what you are looking for scroll down the page and then click on a green link to download the document you are looking for.

If you prefer, you can click on the magnifying glass in the menu bar above, and then type a search term into the provided box (eg planning committee 2014 will show all planning meetings from that year) and hit return to start your search.

Skip to content